Demolition and Excavation in Hornsby

Get It Away is a licensed demolition and excavation contractor serving Hornsby and Hornsby Shire. We handle house and commercial demolition, basement and rock excavation, asbestos removal and tree clearing for site works, under SafeWork NSW demolition licence AD214489. Every job is planned around Hornsby Shire Council’s tree, bushfire and heritage rules.

From site clearing in the Hornsby TOD precinct to knockdown rebuilds on bush-edge blocks, we take your site from approvals support to a level, builder-ready handover.

✓Licence AD214489

✓15+ Years

✓2,500+ Projects

✓$20M Insured

✓4.9 Google Rating

Demolition and excavation services in Hornsby

Hornsby work runs from town centre shopfronts to family homes on bush-edge streets. One team handles every stage, from the first site inspection to a clean, level handover.

House demolition and knockdown rebuilds

Outside the town centre, Hornsby knockdowns are often on sloping or bush-edge blocks with limited access. We disconnect services, clear any asbestos, demolish the house including footings and slab, and hand over a level site set to your builder’s levels. Neighbours get notice before work starts, and dust and noise are controlled throughout.

Commercial and industrial demolition

Most commercial work in Hornsby is in the town centre, where shops and offices line the Pacific Highway, Peats Ferry Road and George Street. We stage demolition so neighbouring businesses keep their access and keep trading, and we separate concrete, brick and steel on site for recycling.

Basement, bulk and rock excavation

New apartment buildings near Hornsby station need basement car parks, while homes on sloping blocks often need a cut-in garage or a level building platform. We excavate to your engineer’s levels, install temporary shoring where specified, break rock with hydraulic hammers and remove spoil to licensed facilities, with compaction records on handover.

Strip-outs, shop defits and make good

Tenancies in Westfield Hornsby and Hornsby Mall come with centre rules: inductions, loading dock bookings, lift protection and restricted work hours. We plan the defit around them and return the space to the make-good standard in your lease. We also strip out apartments near Hornsby station, working to strata by-laws and approved hours.

Garage, shed and pool removal

Older Hornsby blocks can carry detached garages, fibro sheds and in-ground pools. Garages and sheds are checked for asbestos before they come down. Pools are fully removed or broken down and filled, with the void compacted as required. We give you the invoices and photos you need to have the pool removed from the NSW Swimming Pool Register through Council. In a heritage conservation area, even a garage or shed needs its approval pathway checked first.

Site clearing and remediation

Before your builder starts, we remove slabs, driveways, retaining walls, fences and old footings. On bush-edge blocks, sediment fencing goes in first so soil and runoff stay out of the gullies and creeks below. If old fill or contaminated soil turns up, we arrange testing and licensed removal.

Site clearing for the Hornsby TOD precinct

Central Hornsby was rezoned in late 2024 as a Transport Oriented Development (TOD) precinct. The new planning controls support more housing and mixed-use development around Hornsby station and the town centre. We prepare these sites for developers and builders.

Not sure if your lot is inside the precinct? Check the NSW Planning Hornsby precinct page or your planning certificate.

What we deliver on precinct sites

  • ✓Demolition of houses and older commercial buildings on combined lots
  • ✓Hazardous materials surveys and asbestos clearance
  • ✓Bulk and basement excavation
  • ✓Traffic control for trucks on busy streets
  • ✓Dust, noise and vibration controls next to trading shops

Tree removal in Hornsby

We clear trees as part of demolition, excavation and site preparation, so tree work and machinery are planned as one job.

Most tree removal in Hornsby needs a council permit. Some trees are exempt, such as trees under 3 metres outside native vegetation, trees within 3 metres of your home’s foundations and exempt species. These exemptions don’t apply in heritage conservation areas, or in and within 50 metres of endangered and critically endangered ecological communities such as Blue Gum High Forest. Large Sydney blue gums or blackbutts on your block need an arborist check early.

Tree removal services

How tree removal works on our jobs

1

Site check. We look at trees near the footprint, access paths and services.

2

Arborist report. We coordinate the assessment council or your certifier asks for.

3

Approval. We help with the paperwork for Hornsby Shire Council.

4

Removal. Approved trees come down, stumps are ground and green waste is recycled.

Asbestos removal in Hornsby

SafeWork NSW says homes built before 1990 are likely to contain asbestos, so we check every older Hornsby home before demolition starts.

What’s included

  • ✓Asbestos survey before demolition
  • ✓Licensed removal, with SafeWork NSW notified at least five calendar days ahead for friable asbestos or more than 10 m² of non-friable asbestos
  • ✓Air monitoring where the job requires it
  • ✓Clearance certificate before demolition continues
  • ✓Disposal at EPA-approved facilities

Loose-fill asbestos in Hornsby

A NSW Government planning circular lists Hornsby among the council areas where loose-fill asbestos insulation is more likely, and flags homes built before 1980. Search the NSW loose-fill asbestos register and check your planning certificate before you plan demolition.

Asbestos removal services

General information only, not health advice. If you suspect asbestos, don’t disturb it. Have it tested by a licensed assessor or removalist and follow SafeWork NSW guidance.

Hornsby site conditions we plan for

Sandstone

Hornsby sits on Hawkesbury Sandstone, so many basement and pool digs hit rock. We check for it at the site inspection, so your quote and program allow for it from day one.

Bushfire-prone land

About 40% of properties in the shire are mapped bush fire prone, according to Hornsby Shire Council. A new home on these blocks usually needs a Bushfire Attack Level (BAL) assessment, so order it early.

Steep and tight blocks

Many blocks fall away to bushland gullies. We use compact and zero-swing excavators where standard machines won’t fit, and plan access before we mobilise.

Recent sandstone excavation project

Basement excavation in East Ryde

Our crew used a mini excavator with a hydraulic rock breaker to cut sandstone along the footing line beside the existing home. The house was temporarily shored on props while excavation continued underneath it. Many Hornsby basements need the same rock breaking and shoring work.

Mini excavator with a hydraulic rock breaker cutting sandstone beside an East Ryde home during basement excavation
Rock breaking along the footing line
East Ryde home temporarily shored on props while basement excavation continued beneath it
The home shored while excavation continued

Free cost calculator

Hornsby demolition cost calculator

Get an instant budget range for your Hornsby project before you book a site inspection. The calculator covers house, commercial and pool demolition plus excavation. Enter Hornsby as your suburb to start.

No sign-up needed. The result is a preliminary range, and we confirm a fixed price after inspecting your site.

Get My Hornsby Estimate

What moves the price on Hornsby sites

Rock: breaking and removing sandstone adds time and equipment

Access: steep or narrow blocks may need smaller machines

Trees: arborist reports and approved removals add to the scope

Asbestos: the type and amount found in the survey

Approvals: a DA in a heritage area adds documents and time

Town centre: traffic control and restricted work hours

Demolition approvals in Hornsby

Most demolition here goes through one of two pathways. Your planning certificate shows which one applies.

CDC (Complying Development Certificate)

Who approves it

A private certifier

Usually suits

A standard house, garage or pool demolition that meets the NSW Demolition Code

Typical timeframe

Varies. The NSW average was 20 to 22 days in July and August 2026

DA (Development Application)

Who approves it

Hornsby Shire Council

Usually suits

Heritage items, homes in a heritage conservation area, and sites that don’t meet the code

Typical timeframe

Varies with the application, site constraints and any extra information or approvals needed

Heritage areas

In the Hornsby West Side conservation area, demolishing a house generally needs development consent under clause 5.10 of the Hornsby LEP, usually with a Statement of Heritage Impact. Minor works with no adverse heritage impact may get written exemption advice from council instead. Council exhibited draft heritage studies until 31 August 2026, proposing about 120 new listings and two new conservation areas, so check early if your street could be affected.

Service disconnections

Hornsby is on Ausgrid’s electricity network. We coordinate the power, gas and Sydney Water disconnections so your site is safe before demolition starts.

Approval information is general and current as at October 2026. It is not planning advice. Confirm your pathway with a certifier or Hornsby Shire Council.

Our Location

Your Local Team, Based in Lidcombe

Address

20 Cambridge St, Lidcombe NSW 2141

Phone (Lidcombe Office)

+61 434 566 733

Phone (Headquarters)

1300 313 371

Email

info@getitaway.com.au

Licence

ABN: 69 145 254 119 | SafeWork NSW DE2 AD214489

Call Now: +61 434 566 733

Get a fixed quote for your Hornsby site

Tell us what you’re planning to build. We’ll inspect the site and give you a fixed, itemised quote.

Get It Away Demolition & Excavations Pty Ltd · ABN 69 145 254 119 · SafeWork NSW Restricted Demolition Licence (DE2) AD214489

Frequently Asked Questions

Usually 1 to 5 working days on site. Allow about 1 to 2 weeks from setup to a level site when asbestos removal and service disconnections are included. Rock, steep access or large trees can add time, and approvals need to be in place before work starts.
Yes, for the demolition side. We prepare the documents your certifier or council needs, such as the demolition work plan, asbestos report and service disconnection evidence, and lodge SafeWork NSW notifications. Approvals for your new building stay with your builder or designer.
It is sorted on site. Brick, concrete, steel and timber are recycled where possible, and the rest goes to licensed facilities. Asbestos is kept separate and disposed of at EPA-approved sites. You get a clean, level block ready for your builder.
Your address, photos of the property and any plans or approval documents you already have. Hazardous materials reports help too. We then inspect the site to confirm access, rock, trees and asbestos, and give you a fixed, itemised quote. There’s no cost or obligation.
Yes. Alongside Hornsby, we cover Waitara, Hornsby Heights, Asquith, Normanhurst, Pennant Hills and other suburbs across Hornsby Shire. The same council tree, bushfire and heritage checks apply throughout the shire, and every job is planned and run from our Lidcombe office.
Yes. We remove rear additions, garages, outbuildings and internal walls while protecting the part of the house you keep. Partial demolition still needs the right approval, and we brace the retained structure where needed so it stays sound throughout the works.
Scroll to Top